Call Now for Service

Electrical Service Upgrades

Electrical Service Upgrades

Panel and service upgrades that increase capacity, improve safety, and bring older electrical systems up to modern expectations.

  • 100 to 200/400 Amp Upgrades
  • Panel Replacements
  • Code Corrections

Overview

If you’re adding major loads like HVAC, a workshop, or an addition, your existing electrical service may not be sized for it. We upgrade services and panels with a focus on safety, organization, and a clean final result.

We coordinate the work so outages are planned and inspections are handled smoothly, and we label your panel so the system is easier to live with and maintain.

Common Projects

  • 100A → 200A upgrades (and larger where required)
  • Panel replacements and circuit reorganization
  • Grounding and bonding corrections
  • Service entrance and meter equipment updates
  • Troubleshooting hot spots, loose connections, and nuisance trips

How It Works

  1. 1

    Assessment

    Review your current service, loads, and future plans to confirm the right capacity and scope.

  2. 2

    Plan + schedule

    Coordinate the outage window and align the work with inspection requirements to keep things moving.

  3. 3

    Upgrade day

    Replace the panel/service equipment, organize circuits cleanly, and apply clear identification.

  4. 4

    Test + label

    Verify operation, label circuits, and walk you through changes so the system is easy to manage going forward.

Frequently Asked Questions

How long will my power be off for a panel upgrade?

Outage time depends on the scope and existing wiring. We plan ahead to keep the window as short and predictable as possible.

Do you coordinate with the utility?

When required for service work, we coordinate the necessary steps so the upgrade is completed safely and correctly.

Will my new panel be labeled?

Yes, we provide clear labeling so you can identify circuits quickly and reduce confusion later.